MetroVolt › Readiness & Timeline
Readiness & Timeline
What Is Frozen vs Still Moving
MetroVolt’s core physics parameters are frozen for this design; the schedule, fleet details, and unresolved gates are still moving.
Two kinds of stability
Some things about MetroVolt are settled for the current design and used consistently across all Kronos materials; others are explicitly still in motion. Separating the two prevents both false precision and false uncertainty.
What is frozen
- Core: 26.49 T plug, 17 T throat, neutron fraction ~5.44%, D-³He fuel, direct energy conversion.
- Architecture: tandem-mirror burner core shared by Aegis and MetroVolt.
- Sequence: breeder first, then burner test unit, then fleet.
What is still moving
- Exact dates (targets: test ~2032, fleet ~2036).
- Fleet-scale details, siting specifics, and housing engineering.
- Every open physics and engineering gate.
Frozen parameters are used exactly and not reinvented per document. Moving items are stated as targets or open questions, never as settled results.