MetroVolt › Readiness & Timeline
Readiness & Timeline

The Net-Electric Milestone

Net electric — more electricity out than the machine consumes — is the burner’s defining bar, unproven anywhere in fusion today.

The hard threshold

Net electric means gross electrical output exceeds everything the machine recirculates: magnets, heating, cryogenics, and balance of plant. It is a harder bar than scientific gain, and no fusion machine has demonstrated it. It is the milestone that separates a research device from a power generator.

MetroVolt is designed toward net electric via direct energy conversion, which recovers charged-particle energy efficiently. But the design intent is not a demonstration. Net electric depends on the sustained burn, the DEC efficiency, and the recirculating-power budget all landing together on real hardware.

SimulationfrozenTest unitbuilt ~2032Gatesmet?Commercialfleet ~2036No-go returns to simulation & test — dates move before physics does.

Why we state it so plainly

Overclaiming net electric is fusion’s most common credibility failure. MetroVolt states that there is no hardware net-gain claim before the breeder’s first-of-a-kind milestone, and no burner net-electric claim before the test unit measures it. The firm-power value proposition rests on this milestone, which remains ahead.

Content reviewed August 2026 · design-and-simulation stage