MetroVolt › Readiness & Timeline
Readiness & Timeline

The Go / No-Go Decision Gates

The program advances through explicit decision gates; failing a gate returns work to simulation or test rather than moving forward.

Gates, not momentum

A credible program does not advance on momentum alone. It passes explicit go/no-go gates: the design is frozen for a build only when prior results justify it, and a build proceeds to a fleet only when its results clear the physics and engineering questions. Each gate can send work backward.

SimulationfrozenTest unitbuilt ~2032Gatesmet?Commercialfleet ~2036No-go returns to simulation & test — dates move before physics does.

The main gates

The important property is symmetry: a gate that can only be passed is not a gate. If test-unit results fall short, the correct outcome is a return to simulation and redesign, and a moved date — not a waved-through commitment. This is how dates yield to physics rather than the reverse.

Where MetroVolt is on the ladder

Today MetroVolt is before the design-freeze gate — in simulation, with prototypes ahead. Every later gate is genuinely open, and each is described on its own milestone or gate page.

Content reviewed August 2026 · design-and-simulation stage