Honesty & Transparency

Simulated, Projected, Achieved

Kronos uses three distinct words for three distinct things: simulated (a model output), projected (a forward estimate), and achieved (a hardware result).

Three words, three evidence levels

Precision about evidence needs more than two categories. Kronos distinguishes simulated — a value a model produces under stated assumptions; projected — a forward estimate that may fold in scaling, engineering margins, or fleet assumptions; and achieved — a value a built machine has produced and that was measured. Each word signals a different distance from hardware.

Achieved on hardwarenot yet — no machine builtQ_engineering (net electric)design target onlyQ_scientific = 3.424 (breeder)simulated design pointPhysics model verifiedreproducible, published

How they apply to Kronos

Why three, not two

Collapsing 'projected' into 'simulated' would hide the extra assumptions a forward estimate carries — scaling, repeated builds, duty cycle. Collapsing it into 'achieved' would be far worse, implying it happened. Keeping the three separate lets a reader see exactly how many layers of assumption sit between a number and a measurement.

When we quote a number, the word we choose is not decoration. It is the shortest honest statement of what kind of thing the number is.

Content reviewed August 2026 · design-and-simulation stage