Skip to content
Technology How it works Breeder — Hyperion Burner — Aegis Burner — MetroVolt AI-Native Architecture Magnets Fuel cycle Safety Roadmap
Solutions AI & Data Centers Defense & Government Grid & Baseload Neutron Detection Quantum
Learn Technical Library
Proof Publications Whitepapers Technical Library Open Science & Reproducibility The Honest Gates
Company About / Mission Leadership Environment Health & Safety Investors Careers Press Contact
3D Model
Hyperion › Materials & Components
Materials & Components

Screening Currents and Field Error

Wide REBCO tape carries induced screening currents that distort the magnetic field and must be managed for plasma control.

A side effect of flat tape

Because REBCO is a wide, flat conductor, changing fields induce screening currents that circulate within the tape width. These persist and produce a magnetization that adds an error to the intended field. In a precision device that shapes a negative-triangularity plasma, uncontrolled field error degrades control and can shift the equilibrium.

FIELD ON THE CONDUCTOR vs ON AXIScoil pack16.84 T8 T on axis|B| falls ~1/RScreening currents perturb the intended field distribution

Why it matters here

The breeder holds a -0.30 triangularity shape that is less naturally stable than a conventional D. Field error from screening currents competes with the poloidal-field system's ability to hold that shape. The effect is time-dependent: it is largest during ramps and decays with a long time constant, so it couples plasma-control design to magnet design.

Mitigations

Options include striating or narrowing the conductor, controlling ramp rates, and modeling the magnetization so the control system compensates. The breeder treats field error as a design input to both the magnet and the control system rather than a nuisance discovered at commissioning.

Measurement and feedback

Because screening-current error decays slowly and depends on operating history, the breeder plans magnetic diagnostics that measure the actual field and feed the control system, so compensation is based on the real magnetization state rather than a static model. Diagnostics near the plasma must themselves survive the radiation environment, tying field-error management back to component design.

This page documents a design and simulation study, not a built machine. Construction begins Q2 2027; first-of-a-kind first tritium is targeted near 2030. Figures are computed, reproducible targets, not measurements.

Content reviewed August 2026 · design-and-simulation stage