Performance Demonstration

Sustained operation at the design point, measured against the frozen targets.

Goal
Meet frozen targets, measured

The final commissioning stage sustains operation at the design point and measures it against the frozen targets — the breeder's Q = 3.424 and 88.7 MW, the burner's QE = 1.31 under its stated gate conditions. It is where computed design targets meet measured reality.

Kronos frames these targets as the demonstration goal, not a present claim.