Skip to content
Technology How it works Breeder — Hyperion Burner — Aegis Burner — MetroVolt AI-Native Architecture Magnets Fuel cycle Safety Roadmap
Solutions AI & Data Centers Defense & Government Grid & Baseload Neutron Detection Quantum
Learn Technical Library
Proof Publications Whitepapers Technical Library Open Science & Reproducibility The Honest Gates
Company About / Mission Leadership Environment Health & Safety Investors Careers Press Contact
3D Model
AI Architecture › Advanced Capabilities
Advanced Capabilities

Tritium Accountancy & Permeation

Real-time, safety-critical tritium inventory and barrier permeation.

STRATEGY / SLOW ▲ ▼ MICROSECOND REAL-TIMEL7Ecosystem & Strategytelemetry ▲ control ▼open ▸L6Experience & Visualizationtelemetry ▲ control ▼open ▸L5Applications & Copilotstelemetry ▲ control ▼open ▸L4Orchestrationtelemetry ▲ control ▼open ▸L3Twin Modeling & AItelemetry ▲ control ▼open ▸L2Data Fabrictelemetry ▲ control ▼open ▸L1Control Planetelemetry ▲ control ▼open ▸L0Foundationtelemetry ▲ control ▼open ▸PHYSICAL S.M.A.R.T. GENERATOR PLANTBREEDER · HYPERION1R0 1.2 m · A 2.5 · 16.84 T · δ −0.30BURNER · TANDEM MIRROR2317 T throat · 26.49 T plug · fₙ 5.44% · DEC1 center stack + plasma · 2 high-field plug · 3 expander → direct converterCOLOR GRAMMAR strategy AI-workflow infra/data models reactor/DECLINE SEMANTICStelemetry (µs)controlKRONOS FUSION ENERGYAI-NATIVE S.M.A.R.T. GENERATORMASTER BLUEPRINTSHEET 01REV. 2026-08L0-L7 · 2 MACHINES
The AI-Native S.M.A.R.T. Generator Master Blueprint — eight layers (L0→L7), one control stack, wired to both machines. Telemetry rises in microseconds; control descends the same path.

Category: B · physics  ·  Plugs into: L3  ·  Horizon: FOAK  ·  Status: on the roadmap — not yet built

What it is

A dynamic model of the tritium fuel cycle — bred, extracted, stored, burned, and permeating through barriers — tracked in real time. On the breeder this is the principal safety and licensing quantity.

The method

A fuel-cycle dynamics model with permeation physics, coupled to the blanket and plant sensors; it drives the in-vessel inventory limit.

Why it matters

Real-time tritium accountancy is a regulatory expectation and a safety necessity, not a periodic report. Plugs into L3, feeding L7 reporting.

Content reviewed August 2026 · design-and-simulation stage