Live displacement damage, helium production, and activation inventory.
The AI-Native S.M.A.R.T. Generator Master Blueprint — eight layers (L0→L7), one control stack, wired to both machines. Telemetry rises in microseconds; control descends the same path.
Category: B · physics · Plugs into: L3 · Horizon: NOAK · Status: on the roadmap — not yet built
What it is
A real-time neutronics module tracking displacement damage (dpa), helium production, and the activation inventory of every component as the machine runs — a Monte-Carlo transport surrogate.
The method
A fast surrogate of the neutron-transport sweep (the L0 offline calculation), updated with live power, giving component-by-component damage and activation.
Why it matters
Lifetime, maintenance, and waste all key off these numbers; live tracking turns them from annual estimates into an operational signal. Plugs into L3, feeding predictive maintenance and the licensing record.