The paper's last headline numbers trace to a runnable source too:
S63_lcoe_ladder.py, the deterministic generator for the
Table-26 LCOE cells. The basis is stated, not hidden: CRF at your discount rate over 25 years, capacity factor 0.90,
tiered O&M, and Wright's-law learning on FOAK capital. At the deposited defaults the gold dots reproduce
the printed table. Then stress it — the curve answers instantly.
Capex classes: $6,500 (Mode B, low) · $9,000 (central) · $11,500 (Mode C, high) per kWe. O&M tiers with class: $19 / 19.5 / 21 per MWh — the deposited basis, verbatim.
The plain-language paper behind this instrument: The Honest Cost Ladder: FOAK $84–92 to Fleet $48–56 · Learning Curves That Pay: Wright’s Law from Unit 1 to Unit 50.