KRONOS·FUSION
Learn › Comparisons & deep-dives
Deep-dive

Deep Dive: Cold Start to Grid

The sequence that takes a Kronos plant from cold vacuum to grid power — breakdown, current ramp, heating to burn, and handoff to steady-state operation.

1
Evacuate and cool magnets
2
Gas breakdown → plasma
3
Ramp current (solenoid), heat to burn
4
Hand off to steady-state (bootstrap + CD)

Bringing a fusion plant online is a choreographed sequence, each step bounded by the machine's stability and hardware limits. For Kronos MetroVolt, the path from cold to grid runs:

Throughout, the digital twin and control stack hold the plasma inside its safety envelope. Any loss of input safely ends the burn.

Watch