The tritium supply gap.
Tritium decays at 5.5%/yr against one aging production route — and every fusion company will need it to start. Kronos is sized to that national requirement.
A material that must be remade every year.
Continuous decay
5.5% of inventory is lost annually — a stockpile that must be continuously replenished.
One aging route
Domestic production hangs on a single, aging path.
A fusion startup crunch
Every D–T effort needs startup tritium; demand is set to outrun supply.
HYPERION adds a purpose-built domestic source — ~1.7 kg/yr demonstrated toward a 4 kg/yr national-duty target.