KRONOS·FUSION
Learn › Comparisons & deep-dives
Deep-dive

Deep Dive: The Fusion Pilot Plant

Between the physics testbed and the full commercial unit sits the Kronos FPP — a ~0.25 GW-class machine that proves integrated operation and can generate pilot revenue.

Major radius
R₀ = 2.7 m
Field
5.8 T on axis (29 T peak conductor)
Current
I_p = 22 MA
Fusion power
~0.25 GW-class

Scaling from a physics testbed to a full commercial reactor in one jump would be reckless, so the Kronos program includes an intermediate fusion pilot plant (FPP) — larger than the G1 testbed but smaller than full MetroVolt.

ParameterFPP value
Major radius R₀2.7 m
On-axis field B₀5.8 T (29 T peak conductor)
Plasma current I_p22 MA
Fusion power~0.25 GW-class

The FPP carries the gate-adjudication mission — proving integrated operation at meaningful scale, where G1 proves the core physics and MetroVolt delivers full-scale firm power — with an optional post-gate role generating pilot revenue. It's the rung that turns validated physics into a demonstrated plant. See the gate program.