Can fusion power a data center?
Short answer: that's exactly what Kronos is building MetroVolt to do.
Yes — a fusion generator is well-matched to data-center load: firm, 24/7, carbon-free, and sited near the campus. Kronos's MetroVolt is designed for exactly this.
Always on
AI clusters run continuously; fusion is firm, weather-independent baseload.
DC-native
Direct energy conversion outputs DC — no steam turbine in between.
Right-sized
Net power scales with machine length — up to +2,832 MW_e.