What was computed
55m: 449.5 MWth waste heat; 142.9 MWth drives LiBr chilling for a 100MW-IT campus; PUE 1.35->1.17, +18.5 MWe effective
Reproduce this
# Reproduce MV-L1-A8 against the frozen record pip install kronos-toolkit # github.com/KronosFE/kronos-toolkit python -c "from kronos_toolkit.verify import run_regression; run_regression()" # MV-L1-A8 is anchored in the 2026-08-27 freeze spine (verdict: reproduced).