What was computed
850 MWe from ~487m strip: 15-44 MW/acre site-level (3.0 with 400m buffer) — beats 0.5-3 MW/acre campus norms; linear-ROW archetype
Reproduce this
# Reproduce MV-L1-A7 against the frozen record pip install kronos-toolkit # github.com/KronosFE/kronos-toolkit python -c "from kronos_toolkit.verify import run_regression; run_regression()" # MV-L1-A7 is anchored in the 2026-08-27 freeze spine (verdict: revised).