{GA}
All gates · burner · L1 · metrovolt
Validator · Gate MV-L1-A3

Direct-DC delivery via DEC (MetroVolt)

MV-L1-A3reproducedverification card freeze 2026-08-27

Frozen result

MWe
54.1%

What was computed

HVDC-native 1903.8 MWe = 54.1% gross at phi_i 248.7 kV; 2-3 conversion stages vs 4-5 AC; eta_dec 0.70 assumed constant

Reproduce this

# Reproduce MV-L1-A3 against the frozen record
pip install kronos-toolkit   # github.com/KronosFE/kronos-toolkit
python -c "from kronos_toolkit.verify import run_regression; run_regression()"
# MV-L1-A3 is anchored in the 2026-08-27 freeze spine (verdict: reproduced).