{GA}
All gates · burner · L1 · metrovolt
Validator · Gate MV-L1-A1

Data-center load-following + uptime (MetroVolt)

MV-L1-A1reproducedverification card freeze 2026-08-27

What was computed

FINDING: DEC path ms-class load-following works; throttle depth limited by recirc 4.14x leverage — filed as design datum

Reproduce this

# Reproduce MV-L1-A1 against the frozen record
pip install kronos-toolkit   # github.com/KronosFE/kronos-toolkit
python -c "from kronos_toolkit.verify import run_regression; run_regression()"
# MV-L1-A1 is anchored in the 2026-08-27 freeze spine (verdict: reproduced).