{GA}
All gates · burner · L1 · aegis
Validator · Gate AG-L1-A1

Islanded / forward-base operation (Aegis)

AG-L1-A1reproducedverification card freeze 2026-08-27

What was computed

FINDING (not contradiction): black-start needs ~340 MWe external; islanded steady-state closes at +104 MWe net — filed as design datum

Reproduce this

# Reproduce AG-L1-A1 against the frozen record
pip install kronos-toolkit   # github.com/KronosFE/kronos-toolkit
python -c "from kronos_toolkit.verify import run_regression; run_regression()"
# AG-L1-A1 is anchored in the 2026-08-27 freeze spine (verdict: reproduced).