{GA}
All gates · burner · L1 · metrovolt
Validator · Gate MV-L1-A7

Power-density & campus siting fit (MW/acre vs hyperscale build norms)

MV-L1-A7revisedverification card freeze 2026-08-27

What was computed

850 MWe from ~487m strip: 15-44 MW/acre site-level (3.0 with 400m buffer) — beats 0.5-3 MW/acre campus norms; linear-ROW archetype

Reproduce this

# Reproduce MV-L1-A7 against the frozen record
pip install kronos-toolkit   # github.com/KronosFE/kronos-toolkit
python -c "from kronos_toolkit.verify import run_regression; run_regression()"
# MV-L1-A7 is anchored in the 2026-08-27 freeze spine (verdict: revised).