{GA}
All gates · burner · L1 · uq
Validator · Gate KX-L1-A14-BU

Bayesian optimization UQ & calibration on the burner

KX-L1-A14-BUreproducedverification card freeze 2026-08-27

What was computed

Setup: 200-eval BO (40 init incl. the anchor + 160 EI-guided) maximizing Q_E over tight priors around the M-45 anchor: ne ∈ [2.21, 2.99]×10²

Reproduce this

# Reproduce KX-L1-A14-BU against the frozen record
pip install kronos-toolkit   # github.com/KronosFE/kronos-toolkit
python -c "from kronos_toolkit.verify import run_regression; run_regression()"
# KX-L1-A14-BU is anchored in the 2026-08-27 freeze spine (verdict: reproduced).