{GA}
All gates · burner · L1 · design
Validator · Gate BU-L1-A11

Strategic-isotope-foundry configuration (method)

BU-L1-A11reproducedverification card freeze 2026-08-27

Frozen result

MW
3.836

What was computed

0.056081 kg-T/fpy/MW burn; net TBR 1.8 -> 2/4/6 kg @ 44.6/89.2/133.7 MW; DP 85.04 MW=3.836 kg checks; TBR 0.742 => deficit any P_fus

Reproduce this

# Reproduce BU-L1-A11 against the frozen record
pip install kronos-toolkit   # github.com/KronosFE/kronos-toolkit
python -c "from kronos_toolkit.verify import run_regression; run_regression()"
# BU-L1-A11 is anchored in the 2026-08-27 freeze spine (verdict: reproduced).