{GA}
All gates · breeder · L2 · divertor
Validator · Gate BR-L2-A11h

Minimum-mission-power option

BR-L2-A11hreproducedverification card freeze 2026-08-27

What was computed

UPLIFT PATH CONFIRMED: T_BLK 65cm -> TBR 1.2407 (>1.2097 = 1 kg-T/yr at 85 MW); 80cm 1.2545; 2-kg bar 1.4194 needs more levers

Reproduce this

# Reproduce BR-L2-A11h against the frozen record
pip install kronos-toolkit   # github.com/KronosFE/kronos-toolkit
python -c "from kronos_toolkit.verify import run_regression; run_regression()"
# BR-L2-A11h is anchored in the 2026-08-27 freeze spine (verdict: reproduced).