S65 — DEC exhaust on closed field lines (extends S51)
Register entry: S65 · DEC exhaust on closed field lines (extends S51) · Decision Gate (governing feasibility gate for the design point) · Part V — Referee-Requested Extensions.
Primary files: extensions/S_referee_extensions.py (E1)
Kronos Fusion Energy — architecture validation. HYPERION breeder (A = 2.5, R₀ = 1.2 m, Q = 3.424) and the D–³He tandem-mirror generator (26.49 T peak throat field). Published under CC BY 4.0 in the Kronos two-paper deposits (DOI 10.5281/zenodo.21746157 and DOI 10.5281/zenodo.21746479).