Paper 2.61 · Phase 2 · De-Risking & Systems

Recirculation-Resolved Q_E Closure in a D-³He Tandem-Mirror Burner: The Synchrotron-Limited Operating Point and the Carried-Open Plug Gate

P. I. Ford and G. L. Kulcinski · Kronos Fusion Energy

DOI 10.5281/zenodo.22645860 · Editorial edition · 2026 Kronos publication series

Listen ·
Cite & reproduce

Published open access (CC BY 4.0) on Zenodo. The deposit is the paper's data & code package: manuscript, data-and-methods, figures, a run-all reproduction driver and per-file checksums.

DOI: 10.5281/zenodo.22645860

Data & code package ↗ Published record ↗ All publications