Paper 2.77 · Phase 2 · De-Risking & Systems

Calibrated Uncertainty, Conformal Prediction, and Abstention for Safety-Critical Fusion Control: Handing Authority Back to a Deterministic Floor Out of Distribution

P. I. Ford · Kronos Fusion Energy

DOI 10.5281/zenodo.22645813 · Editorial edition · 2026 Kronos publication series

Listen ·
Cite & reproduce

Published open access (CC BY 4.0) on Zenodo. The deposit is the paper's data & code package: manuscript, data-and-methods, figures, a run-all reproduction driver and per-file checksums.

DOI: 10.5281/zenodo.22645813

Data & code package ↗ Published record ↗ All publications